NOVITA / Menswear development guide

A clearer specification makes a better first sample.

A section-by-section checklist for preparing a tech pack before clothing production. Work through each section and confirm every item with your manufacturer before sampling begins. Adapt individual fields to your product and destination market.

16 sections76 checkpointsDownload or copy
Download blank PDF
0 of 76 reviewed

Tick items as you check them. Selections are not saved after you leave the page.

What this tech pack preparation checklist is for

A tech pack preparation checklist exists to turn a design idea into instructions a factory can quote from and sample against. Most first-round problems are not disagreements about taste. They are gaps: a measurement with no stated method, a colour named but not referenced to a standard, a trim described but not sourced. Each gap becomes a question the factory has to ask, and every question costs a round of clarification before pricing or sampling can start.

The sixteen sections below are grouped into four stages. Product and fit covers the style identity, the technical drawing and the points of measure. Materials and branding covers fabric, weight, colour, trims, labels, artwork and decoration. Making and delivery covers construction, stitching, packaging and sample requirements. Approvals covers revision control and the extra fields knitwear and sweaters need. You can work top to bottom, but the order of decisions matters more than the order of sections: fabric and colour usually have to be settled before a measurement tolerance means anything.

Use this list at three moments. Before you send a request for quotation, so the factory receives a complete brief rather than a partial one. Before sampling begins, so the sample confirms the decisions you actually made. And whenever you revise a style, so the changed sections are recorded and older copies stop circulating. It works alongside a clothing sample development process and a clothing manufacturing RFQ checklist, which cover the stages that follow.

What it does not do is replace a measured specification. If you are working from an existing garment rather than a sketch, the measurement transfer steps in turning a reference garment into a production specification come first. And a completed checklist is not the same as a brief the factory can read without asking questions; that distinction is covered in how a clothing factory reads your tech pack.

01 / Product & fit

Define the style and fit

01

Product Overview

5 checkpoints
ItemWhat to include / confirm
Style name / codeUnique identifier for this style across all documents
Season / collectionWhich drop or season this style belongs to
Product categoryE.g. men’s crew-neck tee, 5-pocket jean
Target customer / marketHelps confirm labelling and compliance requirements
Brief description1–2 sentences describing the garment
02

Technical Drawing / Reference

4 checkpoints
ItemWhat to include / confirm
Front and back flat sketchClear line drawing with all visible construction details
Detail calloutsClose-up sketches for pockets, cuffs, plackets, any special feature
Colourway variationsSeparate sketch or marked-up image per colourway if placement changes
Scale / ratio notesAny measurement ratios the factory should know
03

Measurements / Size Spec

6 checkpoints
ItemWhat to include / confirm
Points of measure (POM) listEach measurement labelled with a POM number
Measurement methodHow each POM is measured (e.g. half chest, flat, 1 cm below armhole)
Tolerance for each POMAcceptable variance (e.g. ±0.5 cm)
Size rangeAll sizes in the size run
Grade rulesIncrement between sizes for each POM
Sample sizeWhich size the sample should be made in
02 / Materials & branding

Specify materials and artwork

04

Fabric

5 checkpoints
ItemWhat to include / confirm
CompositionFibre content percentages (e.g. 100% cotton, 98/2 cotton/elastane)
Fabric structureKnit or woven, specific construction if known
Fabric weight referenceGSM or oz/yd² if already confirmed
Mill / quality referenceFabric code or name if a specific source is required
Finish requirementsEnzyme wash, sanforized, brush finish, etc.
05

GSM / Weight

3 checkpoints
ItemWhat to include / confirm
Target GSMFinished fabric weight target
Tolerance rangeAcceptable variance above and below target
Finished vs raw weightSpecify whether the target is measured before or after finishing/washing
06

Color / Pantone

4 checkpoints
ItemWhat to include / confirm
Pantone code(s)TPG (paper) or TPX (textile) reference for each colour
Colorways per styleList each colourway with its code or name
Lab-dip requirementHow many lab-dip rounds, which colours need approval first
Colour matching standardLight source for approval (e.g. D65, TL84)
07

Trims

6 checkpoints
ItemWhat to include / confirm
ButtonsSize (Lignes), material, colour, placement
ZippersBrand/type if specified, length, colour, puller style
Drawcords / tiesMaterial, width, length, tip type
Rivets / studsPlacement, finish, brand if specified
Elastic / ribbingWidth, content, stretch specification
Interlining / fusingType, placement, weight if specified
08

Labels

4 checkpoints
ItemWhat to include / confirm
Main labelSize, material, folding method, stitch placement
Care labelCare symbols and/or text, fibre content disclosure, country of origin — confirm compliance with the destination market’s labelling requirements
Size labelSize designation, placement
Additional labelsHang tags, brand patches, compliance labels as required
09

Artwork

4 checkpoints
ItemWhat to include / confirm
PlacementPosition on the garment (measurements from reference points)
DimensionsWidth × height of each artwork element
File formatVector (AI, PDF, EPS) preferred; raster minimum resolution noted
Colour separationNumber of colours per print if screen printing is planned
10

Printing / Embroidery

5 checkpoints
ItemWhat to include / confirm
MethodScreen print, DTG, DTF, heat transfer, embroidery, etc.
Size / placementDimensions and position on the garment
Colour specificationPantone or thread code for each colour in the design
Hand-feel expectationSoft-hand, raised (puff), flat, etc.
Wash-fastness expectationConfirm what testing (if any) the buyer requires
03 / Making & delivery

Confirm construction and packing

11

Construction

3 checkpoints
ItemWhat to include / confirm
Seam typesReferenced by ISO 4916 or described (e.g. French seam, flatlock, overlock)
Construction notesAny special construction: bartacks, reinforcement, top-placket details
Assembly sequence notesIf order of operations affects the finished garment
12

Stitching

4 checkpoints
ItemWhat to include / confirm
Stitch typesReferenced by ISO 4915 (e.g. 301 lockstitch, 401 chainstitch)
SPI (stitches per inch)Commonly specified range — confirm with your manufacturer
Thread type / countPolyester core-spun, spun polyester, etc.
Topstitch specificationThread weight, needle spacing, stitch length if different from standard
13

Packaging

5 checkpoints
ItemWhat to include / confirm
Fold methodFlat fold, clip hanger, rolled, etc.
PolybagMaterial, thickness, size, print/label on bag, ventilation holes if needed
Carton specificationsCarton size, pieces per carton, shipping marks
Hanging vs flat packedState which method is required
Special packagingBox, tissue paper, inserts, or brand-specific requirements
14

Sample Requirements

5 checkpoints
ItemWhat to include / confirm
Sample stages requiredProto, fit sample, pre-production sample (PP), sales samples — which apply
What each stage must confirmFit, construction, fabric, colour — matched to the sample stage
Quantity per stageHow many pieces per sample round
Sample fabricConfirm whether sample should use bulk fabric or closest available substitute
Courier accountWho pays for sample shipping
04 / Approvals

Control revisions and knitwear

15

Revision / Version Notes

5 checkpoints
ItemWhat to include / confirm
Version numberIncrement with each revision (v1.0, v1.1, etc.)
Date of revisionDate the version was issued
Changed sectionsWhich sections were changed and what was changed
Approved byName and date of whoever approved this version
DistributionWho has received this version (to avoid outdated copies in circulation)
16

Knitwear / Sweater Specifics

8 checkpoints
ItemWhat to include / confirm
Gauge3GG, 5GG, 7GG, 12GG or 14GG — gauge drives hand-feel, weight and how fine a stitch detail can be
Yarn count and compositionFor example 2/28s 100% cotton, cotton-acrylic blend or lambswool; give the yarn count, not only the fibre
Knit structurePlain/jersey, rib, cable, intarsia, jacquard, pointelle or waffle — attach a swatch photo or reference image
Panel and linking methodFully-fashioned linked panels versus cut-and-sew panels; linking changes shoulder shape and edge finish
Cardigan front and closurePlacket depth, button size and spacing, button versus zip, open front; buttonhole type
Knit trimsRib collar, cuff and hem depth, neck tape, and a main label suited to knit edges
Washing and shrinkageKnits relax and shrink differently from wovens; state the wash test required and the tolerance accepted
Target weight per pieceGarment weight in grams — the clearest control on yarn cost and hand-feel
Facebook-f Tiktok Youtube ↑