DUPRO, or during production inspection, checks a bulk order while there is still time to change how it is being made. It helps a garment buyer catch a recurring measurement, shade or sewing problem before more stock carries the same defect.
This guide explains what to approve before the visit, when to send an inspector, and how to use the findings to decide whether production should continue.
What does DUPRO catch that other checks miss?
DUPRO examines available finished garments, work in progress and relevant production conditions against the buyer’s agreed requirements. You may also see during production check, DPI or mid-production inspection. Define the scope in the booking: providers do not necessarily mean identical coverage by these names.
The distinction is the decision each check supports:
| Check | What it can catch | What it cannot establish |
|---|---|---|
| Pre-production sample approval | Wrong fit, construction, materials or artwork in the proposed reference garment | Whether bulk production will consistently match that reference |
| Factory in-line QC | Sewing and assembly faults as they develop at workstations | An independent judgment of the buyer’s order |
| DUPRO | Whether actual bulk output matches approvals, plus recurring faults and production risks | Conformity of garments not yet made or operations not yet completed |
| Pre-shipment inspection | Finished-order conformity, including available labels and packing | Early prevention of faults already repeated through production |
In-line inspection and in-process inspection can describe ongoing factory checks, not just a booked external visit. Ask who selects the sample, who employs the inspector, and who receives the report.
A during production inspection therefore complements both sample approval and a pre-shipment inspection for apparel. It replaces neither.
When should the buyer schedule it?
Schedule around production risk and available output. Providers give different advice: ECQA describes a 10% to 80% completion window, while Tetra describes 20% to 60%. Neither range is a universal rule.
No fixed DUPRO completion percentage is prescribed by the attribute-sampling standards discussed below. Write your trigger into the purchase order, including what “completed” means and which styles, colours and sizes must be available.
For planning, aim to book the main visit around 20% completed garments, subject to sufficient representative output and the agreed sampling plan. This is a planning starting point, not a standard or a guarantee of suitable coverage.
Waiting even that long can be too late for the wrong fabric, incorrect pattern or misplaced print repeated across cut panels. Add earlier material-release and first-output approvals before the relevant irreversible operation. A finished-garment percentage alone does not tell you how much fabric has already been cut or decorated.
A buyer’s PO clause could read:
> Book the main DUPRO when the agreed completion trigger is reached and representative finished garments are available. Report finished, unfinished, cut and decorated quantities separately by style, colour and size. Obtain buyer approval of materials and first output before further cutting or decoration. Hold affected production after a nonconformity until the named buyer representative gives written release.
Replace the general wording with your order’s actual trigger, coverage and response deadline. Request a progress update before the visit; an inspector arriving to find only an unrepresentative size cannot assess the missing sizes.
What must be approved before the visit?
A during production inspection needs a controlled reference pack. Without signed criteria, an inspector can record observations but cannot give a defensible pass/fail against the missing requirements.
Have the factory and inspector acknowledge the same revisions of:
- Approved PP or production sample: identify the sealed reference and any written deviations. Do not let an earlier development sample become the inspection standard by accident.
- Tech pack and measurement specification: include the point-of-measurement (POM) list, size grading, units, measurement method and tolerance for each applicable point.
- Signed shade band: identify the acceptable colour range and agreed viewing conditions, not merely a colour name in an email.
- Artwork and trims: approve print or embroidery dimensions, location, colour reference, thread, buttons, zippers and other components.
- Labelling and packing specification: approve label content, placement, size identification, assortment and carton requirements.
Settle contradictions before production continues. If the sample and tech pack disagree, name the controlling reference in writing. Do not widen the tolerance after inspection to turn an out-of-tolerance result into a pass. The sample-to-bulk consistency guide helps organise these handoffs.
What is actually inspected in garments?
Inspectors need finished units for garment checks and access to materials and records for upstream risks. QIMA’s garment inspection procedures cover measurements, workmanship, functions, artwork and packaging. Your booking should translate those categories into the following order-specific checks.
Measurements, sewing and alignment
Measure the agreed POMs against the specification for the sampled size. Record actual readings and deviations, not just a tick beside “size checked.” Agree how the garment is laid flat, whether an elastic section is relaxed or extended, and which measurement method controls.
Review skipped or broken stitches, open seams, puckering, unsecured ends and seam construction against the approved reference. Look for recurring faults by operation. A collar, placket or pocket that appears acceptable alone may look wrong when compared with its opposite side or the garment centreline. Use the polo collar and placket inspection checklist where that construction applies.
Decoration, shade and fabric
Check print and embroidery position from defined reference points, plus size, orientation, colour and visible execution. A photograph without a ruler or reference point rarely settles a placement dispute. Do not treat visual approval as proof of wash durability or colourfastness; book the required tests separately with agreed methods.
Compare garments and panels against the approved shade band under the agreed viewing conditions. Ask the factory to trace a mismatch to the fabric roll, dye lot and cut bundle where records allow.
For fabric defects, review roll-inspection records on the agreed 4-point basis and investigate suspect rolls before further cutting. This grades visible fabric faults using penalty points related to inspected area; it is not a garment AQL result. ASTM D5430-26, *Standard Test Methods for Visually Inspecting and Grading Fabrics*, notes that grading options can produce different scores. Agree the option, calculation and acceptance limit; there is no universal score assumed here. See the fabric 4-point inspection guide.
Functions, labels and packing
Check zipper operation, button attachment and other trim functions against the approved construction. Specify any force, cycle or other test protocol rather than improvising one during the visit; the garment zipper inspection checklist provides a focused planning reference.
Check available labels, barcodes, assortment and packing against approved instructions. If final packing has not started, record the check as pending, not passed.
How do sampling and AQL work at mid-run?
Name the sampling scheme in the booking so the inspector and factory can reproduce the acceptance decision. ISO 2859-1:2026 covers lot-by-lot attribute sampling indexed by acceptance quality limit. ANSI/ASQ Z1.4-2003 (R2018) is another attribute-sampling reference. Specify the standard, edition and agreed plan; do not mix tables or assume editions are interchangeable.
For a during production inspection, define the inspection lot first. Is it the finished stock available that day, a particular style, or another agreed population? State unfinished quantities separately. A sample of available garments does not establish the quality of future output.
The lot size and inspection level lead to a sample-size code letter. The selected plan and AQL then determine the applicable sample size and acceptance/rejection numbers, including any table directions. Ask the provider to show the lookup and identify the inspection severity and plan type. The AQL sampling guide for clothing buyers explains the buyer’s decisions without replacing the named standard.
Hypothetical booking-sheet illustration (not a universal specification): “Inspection level and plan: as agreed with the buyer; major/minor AQL limits: per the buyer’s approved SOP; critical findings: separate buyer-approved safety and release rules.”
Agree defect classifications before the visit:
- Critical: safety-related hazards, such as a broken needle in a garment.
- Major: faults affecting use or saleability, such as an open seam or nonfunctional fastening.
- Minor: cosmetic departures that do not materially impair use, subject to the buyer’s defect catalogue.
V-Trust’s classification guidance illustrates these distinctions. Your approved catalogue should settle borderline cases, including logo placement. Set separate acceptance rules by class. AQL is a sampling-plan parameter, not permission to knowingly ship a defective percentage or evidence that every unit is safe.
How should you read a DUPRO report?
Read scope and coverage before the verdict. A during production inspection report should identify the reference revisions, production status, sampled population, selected quantities and checks left incomplete. Confirm that the inspector selected stock rather than inspecting only garments presented by the factory.
Then separate these results:
- Defect counts: which findings fall into each class, with photographs, measurements and identifiers for affected stock.
- Sampling decision: whether observed counts stayed within acceptance limits or reached rejection numbers under the agreed counting rules.
- Other requirements: failed measurements, functions, safety conditions or specification requirements that may have separate rejection rules.
Defects per hundred units, often called DHU, means recorded defects ÷ inspected units × 100. It counts findings, not necessarily defective garments: a garment can contain several defects. ASQ distinguishes nonconformities per hundred units from percent nonconforming. Check which basis the report and sampling plan use before comparing counts with acceptance numbers. A pooled DHU figure cannot replace the separate class decisions.
A report can fail because a rejection number is reached or an independently required check fails. It can also be inconclusive when stock, approvals or test facilities are missing. Do not read “not checked” as “conforming.”
Request corrective action for a recurring process weakness even when the sample passes. Request re-inspection when corrected stock needs a fresh acceptance decision, the original sample was unrepresentative, or an unresolved failure affects release. The report should tell you what happened; your written disposition tells the factory what happens next.
What should happen after a failed check?
After a failed during production inspection, contain the affected stock before production repeats the fault. Agree who can stop affected work, segregate stock and authorise restart. Avoid holding unrelated production unnecessarily, but do not release suspect bundles simply to protect the schedule.
Ask for a corrective-action record that connects each finding to:
- Extent: affected rolls, bundles, sizes, colours, completed garments and work in progress.
- Root cause: the faulty pattern, machine setting, component, instruction or other evidenced cause, rather than “operator careless.”
- Correction: sorting, repair, replacement or rejection of existing stock, with quantities reconciled.
- Prevention: the changed setting, reference, instruction or control that stops recurrence.
- Verification: recorded checks of corrected stock and subsequent output, with an owner and completion deadline.
Photographs of repaired garments show examples, not the condition of the whole affected population. Ask for sorting records, revised measurement sheets and traceable rework identification where relevant. For a safety finding, require a documented containment and verification plan; do not treat a cosmetic repair as closure.
Re-inspect after the factory has completed the agreed correction and representative stock is available. Give the inspector the original findings and corrective-action record, but require fresh sample selection. Checking only the displayed repairs cannot establish whether the remaining stock meets the plan.
Carry unresolved risks and the corrected operation into final inspection. A written DUPRO release should state its scope and remaining conditions, not waive later checks. Use the apparel quality-control checklist to keep those requirements in the final booking.
Factory in-line QC or third-party inspection?
Use both for different jobs. NOVITA’s editorial position is that factory QC and independent inspection are complementary, not substitutes.
Factory QC can see process drift during daily production and correct an operation while it is running. It also works inside the organisation responsible for output and delivery. That creates an incentive conflict when acknowledging faults means rework or delay. A buyer should not mistake an internal sign-off for an independent acceptance decision.
A buyer-appointed inspector provides a separate assessment and report, but only of the accessible stock and agreed scope during the visit. An external visit cannot prove continuous process control or uncover every hidden defect.
Factory QC uses internal resources; third-party inspection adds a separate service cost and may involve travel or re-inspection charges. Obtain a scope-specific quotation rather than budgeting from an advertised headline fee.
NOVITA is an apparel OEM/ODM manufacturer based in Foshan, China, working with brands on private-label and custom production. Its published QC resources cover AQL sampling, fabric inspection and pre-shipment checks. These resources do not establish an individual order’s results.
Buyer’s DUPRO preparation checklist
Send this checklist with the inspection booking. Name an owner for each item and resolve missing evidence before the visit.
| Prepare | What must be on the table |
|---|---|
| Approval pack | Signed sample, shade band, current tech pack, POM tolerances, artwork, trims and packing instructions |
| Scope and trigger | Defined completion basis, available population, required style/colour/size coverage and pending operations |
| Sampling instructions | Named standard and edition, lot definition, inspection level, plan, class rules and defect catalogue |
| Stock access | Identified finished stock and work in progress, with access for inspector-led selection |
| Working area | Suitable lighting, measuring equipment and the agreed functional-check facilities |
| Production evidence | Progress breakdown, fabric records, bundle identification and earlier QC findings |
| Decision contacts | Factory corrective-action owner, buyer release authority and response deadline |
FAQ
Is DUPRO required at a particular completion percentage?
There is no universal scheduling percentage in the sampling standards cited here. Agree the trigger, representative output and any earlier material or first-output holds in the PO. Provider scheduling windows are not production rules for every garment order.
Does a DUPRO pass remove the need for final inspection?
No. Later output and unfinished operations remain outside the mid-run result. Final inspection addresses the finished-order scope, including labelling and packing unavailable at the earlier visit. Keep both bookings explicit rather than assuming a mid-run pass authorises shipment.
What if the approved sample or tolerances are missing?
The inspector can document visible conditions, but the affected requirements cannot receive a defensible conformity decision. Resolve the reference gap in writing. Do not ask the inspector to invent tolerances or choose between contradictory approvals.
Can a passing AQL result override a safety finding?
No. Treat the safety finding under the agreed safety and release rules, separately from routine cosmetic acceptance. Contain affected stock and obtain a documented investigation and verification plan. A sampled pass is not proof that every garment is safe.
When is re-inspection better than a corrective-action email?
Re-inspect when a failed requirement needs renewed acceptance or unresolved evidence affects release. The factory’s email should explain correction and prevention; a fresh inspection assesses the corrected population. Request both when neither alone closes the risk.